A BIM model for your task.
Checked against requirements.

We create a BIM model for an agreed use case or check an existing model before coordination, quantity take-off and use on site.

Illustrative building section: reinforced concrete frame, floor slabs and building services in one model.
01 / Inside the modelStructure and building services in one section

See how elements and systems fit together.

Two ways to work together

Create or check

In either case, we first agree the intended use, required data and acceptance criteria.

01 / Model creation

From source materials to a working model

Inputs
2D materials such as DWG or PDF, requirements, classification, delivery format and intended use. We assess whether the input is sufficient before modelling begins.
Work
We agree scope, detail, attributes, coordination and delivery rules. We create the model and check it against the requirements.
Deliverables
A model version, the agreed data set and a checking report.

The model does not replace statutory design review or certify the project cost estimate.

Discuss model creation →
02 / Model audit

From an existing model to a clear decision

Inputs
The model, review objective, requirements and a control sample.
Work
We check structure, geometry, clashes, attributes and suitability for the selected use case.
Deliverables
An issue report, priorities, assigned owners and a decision on readiness for the next step.

The audit covers agreed checks and does not guarantee the absence of every possible error.

Discuss an audit →

One building / different tasks

From model structure to checking and use

Continuing the opening example with the same structural layout and building services.

The same building section with red markers indicating structural and building services review areas.
02 / Checking the modelEvery issue needs a location

The markers highlight areas to review. An audit records the element, checking rule and issue description.

Illustration of the same building under construction: frame, slabs and site activities.
03 / Use on sitePrepare the model for a practical use case

Intended use defines the model content: coordination, quantity take-off or links to the construction programme.

An illustrative series showing one building. Markers are indicative and are not findings from a real audit. These images are not presented as a completed client project.

Quality criteria

Fitness for purpose can be checked

We define the checking programme before work starts, choosing criteria relevant to your use case.

Structure and data
Compliance with the model structure and completeness of required attributes.
Geometry and coordination
Clashes and deviations against agreed rules and priorities.
Exchange and use
Successful IFC exchange and model readiness for the selected use case.

First step

What do you need your model to do?

Tell us the intended use, available materials and requirements. We will define the scope and whether you need model creation or an audit.

Describe your task →